Senior Regional Construction Scheduler

Full Time
Los Angeles, CA 90401
Posted
Job description

Senior Regional Construction Scheduler

Responsibilities –

Expected to work in either the company office or client office environment.

In addition, the candidate will be expected to:

  • Reporting directly to the Sr Construction Manager for Scheduling and Estimating and provides updates and prepares reports for upper management in order to meet Key Performance Indicators.
  • Supervise Project Schedulers to ensure project timelines are met and interfaces with OARs, Senior Project Managers and other site staff and contractors related to the review of CPM schedules, preparation of project scope and budget.
  • Projects staffing needs and makes recommendations to executive staff to improve staff requirements.
  • Develops and maintains program schedules identifying relationships, logic, milestones, and constraints for construction projects of various types.
  • Independently interprets and reads detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develops a clear understanding of work scope.
  • Reviews Contractor’s Baseline schedule submissions and verifies that all work scope is identified properly and logically sequenced correctly; provides written detailed schedule review comments.
  • Performs QA/QC on contractor schedule submittals for conformance with contract terms; reviews critical path, cost loading, resource loading of man-hours, schedule content, recovery schedules, use of logic relationships and lags, constraints and milestones.
  • Performs schedule Time Impact Analysis for any change orders that affect the construction schedule; conducts schedule negotiations with the OAR and the contractor for any delay time settlements.
  • Reads drawings to determine if work is in or out of scope, and understands terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Performs Critical Path analysis and Earned Value analysis.
  • Walks the construction sites as needed and checks the contractor’s weekly/monthly schedule progress; provides reports to the project OAR and upper management.
  • Effectively communicates with the Contractor regarding all schedule/progress related matters and concerns in the weekly status meetings and all other schedule related meetings.
  • Performs Program Schedule QA/QC reviews on a regular basis.
  • Performs status updates for Program Schedules/Master Schedules on a bi-monthly basis.
  • Prepares reports as needed and directed by Management.

Minimum Requirements –

  • Minimum eight (8) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects.
  • Proficiency in Primavera Latest Version and MS Office Suite

Required Education:

  • Graduation from a recognized college or university with a bachelor’s degree in Architecture, Engineering or Construction Management.

OR

  • Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional two (2) years of experience in the duties above to compensate for the required education.

Required Skills:

  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff

Physical Requirements –

Must be able to carry 20 lbs. for a distance of 50 feet and be able to perform simply grasping, pushing, pulling and fine hand manipulation.

Candidates must currently be legally permitted to work in the US.

Salary –

Salary will be based upon experience and qualifications, however the range for this full-time fully benefitted exempt salaried position is $165,000 to $180,000 annually.

Benefits –

Full time employees are granted 100% medical coverage at the Silver Tier paid by employer (additional coverage to be paid by employee), dental, vision, and AD&D, plus 401K program with employer matching contribution.

Job Type: Full-time

Pay: $165,000.00 - $180,000.00 per year

Benefits:

  • 401(k)
  • 401(k) matching
  • Dental insurance
  • Health insurance
  • Paid time off
  • Vision insurance

Schedule:

  • Monday to Friday

Ability to commute/relocate:

  • Los Angeles, CA 90017: Reliably commute or planning to relocate before starting work (Required)

Education:

  • Bachelor's (Required)

Experience:

  • Construction Scheduling: 8 years (Required)
  • Primavera: 3 years (Preferred)

Willingness to travel:

  • 50% (Required)

Work Location: One location

www.colinoncars.com is the go-to platform for job seekers looking for the best job postings from around the web. With a focus on quality, the platform guarantees that all job postings are from reliable sources and are up-to-date. It also offers a variety of tools to help users find the perfect job for them, such as searching by location and filtering by industry. Furthermore, www.colinoncars.com provides helpful resources like resume tips and career advice to give job seekers an edge in their search. With its commitment to quality and user-friendliness, www.colinoncars.com is the ideal place to find your next job.

Intrested in this job?

Related Jobs

All Related Listed jobs