Job description
Founded in 1969, Herzog is headquartered in St. Joseph, Missouri, with a satellite office in Fort Worth, Texas.
Over the course of our 50+ year history, Herzog has become a national leader in the construction, operations and maintenance of commuter rail, light rail, streetcar, and freight rail projects.
We believe our culture is at the heart of our existence. It is that belief which empowers every member of our professional family to act with purpose and passion as they advance their career throughout their personal pursuit of excellence.
Backed by over five decades of experience, Herzog delivers exceptional customer service and elite results.
Our success is the outcome of our relentless pursuit of excellence, our passion for our customers, safety without compromise, and a deep-rooted belief in the power of team.
We invite you to join us on our journey to excellence as we work to be better today than yesterday and better tomorrow than today.
Herzog is currently seeking a Scheduler throughout the United States to join our team.
Duties and Responsibilities:
*This is a non-exhaustive overview of the job duties for this position.
- Perform tasks required to develop and maintain schedules for the project. Includes cost and resource loading, collecting actual quantities installed per schedules, assess progress data supplied by others, and visual inspection.
- Update cost and resource-loaded schedules and assist in preparation of pay applications.
- Support supervision through preparation and maintenance of forecasts and schedules. May draft construction network diagrams for specific area.
- Develop detailed engineering and construction schedules with construction management. May assemble data from variety of sources including A/E, client engineering, other contractors, and the like.
- Supervise updating of construction forecast to reflect most current plans/requirements.
- Interface with other construction departments to provide scheduling data for items such as change requests, bid comparisons, new work item estimates, and resolution of potential schedule/work problems.
- May provide supervision and/or on-the-job training to clerical and entry level professional personnel assigned to area of responsibility.
- Regular and predictable attendance and punctuality are a requirement for this position.
- Other duties as assigned.
Qualifications:
- Four-year engineering degree plus two or more years similar construction scheduling experience or equivalent combinations of training and related experience.
- Working knowledge of and ability to select/apply resource monitoring and control techniques such as CPM networks scheduling, computer scheduling techniques, etc. as well as an understanding of the nature of process systems, structures and construction technology required.
Pre-Employment Requirements:
- Subject to pre-employment background check and motor vehicle report review.
- Subject to pre-employment physical, medical evaluation, and drug screen due to the safety sensitive nature of this position.
- Successfully complete and maintain any required safety certification and testing on an annual basis.
Physical Requirements:
The physical demands described below must be met by an employee to successfully perform the essential job functions of this role. This position will be physically demanding at times. This is a non-exhaustive overview of the physical requirements for this position.
- Work primarily in an office environment.
- Frequently sits for extended periods of time.
- Frequently use a computer keyboard and office related equipment.
- Requires occasional standing, walking, lifting, stooping or bending.
Safety:
- Herzog is nationally recognized for its excellent corporate safety record which results from all employees at all levels, in all positions adhering to established policies and procedures. Reporting any and all safety violations to your immediate supervisor is a prerequisite for continued employment. Safety diligence by all results in a safe work environment for all.
Benefits:
Herzog offers a robust benefits package including medical and dental coverage. The plans are specific to projects and locations.
Why Herzog:
Led by our beliefs and executed through our behaviors, at Herzog we build upon each other’s contributions by collaborating to make great things possible.
When you join Herzog, we give you the ability and authority to do the same. We will help you take charge of your 20 square feet in a manner that you will facilitate your growth and advancement as a person, as a member of our professional family and in your career.
If you are interested in joining our team, click the Apply button below to start an application.
It is the policy of Herzog Contracting Corp. to provide equal opportunity in employment for all qualified individuals regardless of race, color, religion, ethnicity, national origin, ancestry, disability, medical condition, age, citizenship, sex, sexual orientation, gender, gender identity, gender expression, marital status, pregnancy, genetic information, military status, veteran status, and any other characteristic protected by law.
Job Type: Full-time
Willingness to travel:
- 75% (Preferred)
Work Location: In person
www.colinoncars.com is the go-to platform for job seekers looking for the best job postings from around the web. With a focus on quality, the platform guarantees that all job postings are from reliable sources and are up-to-date. It also offers a variety of tools to help users find the perfect job for them, such as searching by location and filtering by industry. Furthermore, www.colinoncars.com provides helpful resources like resume tips and career advice to give job seekers an edge in their search. With its commitment to quality and user-friendliness, www.colinoncars.com is the ideal place to find your next job.